All Posts

The Latest from the Marathon Factory Floor. MMwM Ep.220

Marathon Mondays with Mal

Get the latest from Mal on a dynamic and informative factory floor walkthrough from the Marathon Coach World Headquarters in Coburg, Oregon. The Prevosts are lined up and getting worked on by the master craftspeople on the factory floor at Marathon, and Mal offers yet another transparent look at the inner workings of Marathon Coach bus conversions. In ep.220, see furniture and cabinetry installations, new flooring upgrades, a brand new X3-45 Prevost shell fresh off the road from Prevost in Quebec, Canada, and more! Also, get a sneak peek at the exciting paint job and “blacked-out” features of 2022 Marathon Show Coach 1340 on just another busy Monday at Marathon Coach.

Find new and pre-owned luxury motorhomes for sale at https://www.marathoncoach.com.

To interact directly with Mal subscribe to the Marathon Mondays with Mal Facebook page at https://www.facebook.com/marathonmal/. Marathon Mondays with Mal is broadcast live on Facebook on Mondays at 9:00 am Pacific.

Share this post
Manufacturing Process
RV Customization
RV Features
RV Interior Design
RV Maintenance
RV Technology

Join the Conversation Here

Comments are closed for this post.

Marathon Mondays with Mal

Related Posts

Join Mal as he explores the world of luxury motorhomes and more.

Exploring Coach 1396’s Finishing Touches – MMwM Ep.387
Marathon Mondays with Mal

Exploring Coach 1396’s Finishing Touches – MMwM Ep.387

Join Mal as he takes you inside Marathon Coach 1396 during its final stages of production. This triple-slide beauty, featuring …
Read more
Cabinetry Craftsmanship – MMwM Ep.386
Marathon Mondays with Mal

Cabinetry Craftsmanship – MMwM Ep.386

Join Mal for a journey through Marathon’s production floor in this episode of Marathon Mondays with Mal. From a look …
Read more
Marathon Coach 1396 In Production – MMwM Ep.385
Marathon Mondays with Mal

Marathon Coach 1396 In Production – MMwM Ep.385

Join Mal Williams at the Marathon Coach mothership for look at Coach 1396, currently just three weeks away from completion. …
Read more